In summer day, the notes of installation rubber running trackThe hot summer is a big challenge for the construction of rubber running track and rubber court. High-temperature exposure accelerates evaporation of water, and heavy rain and damp interfere with construction progress. This not only affects the construction progress, but also has a great impact on construction quality. First of all, we must pay attention to the changes in the weather in advance, according to the weather conditions to formulate relevant construction plans, and do a good job in advance related to drainage dredge work. The second is to do a good job of protecting against the rain in advance, especially the moisture-proof work of raw materials, to avoid wasting materials due to rain. In addition, you can also arrange more workers to do construction collectively, improve the schedule, and arrange the collective construction when the weather is fine. Finally, once it is known that it is going to rain, you can use a large fan to speed up the drying time of the site and avoid damage caused by rain. Summer Construction. Reducing High-Temperature Impacts. The procedures for paving, mixing, curing, and maintenance should be cohesive, minimizing the construction time. At the same time, on the paved roads, it is necessary to build a pergola to avoid sun exposure. Rejecting a damp environment. Avoid construction under conditions of excessive humidity and the weather must be sunny. If the temperature is lower than 10 °C, or higher than 35 °C, it is not suitable for construction; the relative humidity of the atmosphere is more than 85%, and it is better not to carry out construction. Preventing drops of water. No matter for the rubber running track or rubber court, it is afraid of water. Before the glue is solidified, even a single drop of sweat dripping on it will produce obvious air bubbles. Therefore, during construction of summer venues, construction at noon, afternoon, etc. is avoided. Prepare a towel to prevent sweat from dripping on the floor. Beware of shelling. In summer construction, it is necessary to prevent local foaming and shelling after rubber pavement, strictly control the compactness of the base, and prevent the cement base from being loose and delaminating, resulting in the rubber surface being broken. Avoid high-temperature operation. The construction should be stopped under conditions of high temperature, avoid construction during the time when the temperature is high, and the workers should have more water in time to prevent the occurrence of heat stroke.
|