Contact Details
WhatsApp/Tel::008613660776067
Email:grk-sales@foshangrk.com.cn
Facebook:@paintfloor.GRK
Product Detail
SPU-Liquid rubber coating 
|
SPU-Liquid rubber coating
Material : Polyurethane
Type : Liquid
Color : Light green
Brand : GRK
Item No. : SPU-003L
Packing : Drum
MOQ : 1package
Detail
Review(0)

Decription

Liquid rubber coating material is the keymaterial of silicon PU material, which is composed of two-component PU materialand material containing silicone composition. Effectively solve the PU materialsin the professional performance, environmental protection construction, life,routine maintenance and other aspects of the lack.

Structure

SPU-SP.jpg


Feature

Self-leveling, have a good shock absorptionand resilience, anti-skid, strong anti-fouling, one component moisture curing,construction is simple, simple maintenance, environmental performance.

Technical Data

ItemData
ShapeLight green color liquid
Viscosity25℃Mpa·s4000~10000
Solidity%≥ 92
Applicableperiod25℃min≥ 40
Surface curing time25℃h≤ 8
Full curing time25℃h≤ 12
Hardness Shore A40~50
TensilestrengthMPa≥ 1.5
Elongation at break%≥ 450
Compression recoveryrate%≥ 24

Package and Storage

Packing: 30kg/ drum

Upside down stored.

Stored in a cool, ventilated and dry warehouse,keep away from fire and heat sources, and keep waterproof, damp proof and lightproof.

Storage period: six months from the date ofproduction. More than the storage period, the test can continue to use.


Composition

Chemical NameIn % by WeightCAS No.EC No.Molecular Formula
polyurethane resin32%9009-54-5210-898-8C3H8N2O
DOTP13%6422-86-2229-176-9C24H38O4
Calcium carbonate25%471-34-1207-439-9CaCO3
Talc15%14807-96-6238-877-9Mg3[Si4O10](OH)2
iron oxide10%1332-37-2215-570-8-----
Urea formaldehyde5%9011-05-6-----C2H6N2O2

Installation

1) At least apply2layers or 2.7mm

2) Usage: (1layer use0.7—1mm/)

0.7mm/ usage is 1.2-1.3kg

1mm/ usage is 1.4-1.5kg

3) 30kg liquid rubbercoating material mix with 0.9—1.2kg PU resin and 100-180gram water, applied byrubber squeegee

4) After 1 layer, itshould maintain about 10-12 hours, ensure the firstly layer are dry, then thenext process.

5Wheninstall the firstly layer on concrete base ,we suggest 30kg liquid rubber coatmaterial mix with 180gram silica sand .(It is better to seal the sub-base moistures)

IMG_5578.jpg


 Contact Details
Email:grk-nicole@foshangrk.com.cn
WhatsApp/Wechat:(86)13660776067
Solution
Login
Login
leave a message
back to the top