Colorful Pathway Anti-slip Flooring

Outdoor polyurethane Colorful pathway anti-slip flooringColorful PathwayAnti-slip Flooring

Material:Polyurethane

Type:Liquid

Usage:0.1kg/sqm

Packing:25kg/set

Brand: GRK

Place of Origin :Guangdong China


Product Information

Decription

It’s made up of epoxy resin and modified epoxycuring agent. It’s two-component solvent-free, trowel-coated flooring finish.

Feature

ü   Thickness:3 - 5mm. Lifespan: 5 - 10 years.

ü   Slipresistance: good anti-slip performance, reducing brake distance by 35%.

ü   Weatherresistance: unaffected by light or rain, no fading, anti-aging.

ü   Decorative:use professional ceramic particles, colorful, decorative property.

ü   Flameretardant: no solvent, not easy to burn, non-toxic, safe and environmentallyfriendly.

ü   Self-cleaning:good dustproof performance, refreshing after rain, easy to clean.

ü   Efficientand practical: fast curing, at normal temperature, it can be accessed after 5hours of completion, the construction is simple and rapid.

ü   Adhesion:can be applied to the ground, such as tight asphalt, cement, concrete, etc. Itcan also adapt to various organic and inorganic metal surfaces.

ü   Crackresistance: excellent extensibility, not easy to crack.

ü   Easyto maintain: easy to install, short construction and maintenance period, lowmaintenance cost.

Application

Roads, greenways, pathways, sidewalk passages,outdoor plazas, outdoor parking lots, etc.


Recommended Usage

Base

Usage of outdoor pathway paint

Usage of  color ceramic particle(3mm)

Flooring thickness(mm)

Flat concrete base

1.0kg/m2

3kg/m2

3mm

Rough concrete base

1.5kg/m2

3-4kg/m2

3-5mm

Rough asphalt base

1.5-2.0kg/m2

4-5kg/m2

3-5mm


Note

Drying time and recoatable time are determined under standard conditions (25 ° C, 60% humidity), forreference only. There are large differences in drying speeds at differenttemperatures and humidities, as well as film thickness, ventilation, andunderlying coatings. Generally, when the temperature israised, the drying time and the recoatable time are shortened; when thetemperature is lowered, the drying time and the recoatable time are lengthened.


 Contact Details
Email:grk-wendy@foshangrk.com.cn
WhatsApp/Wechat:(86)13660776067
Globe:09166359480
Solution
Login
Login
leave a message
back to the top